SHN Centenary Hospital
Road Realignment
Project Overview
The SHN Centenary Hospital Road Realignment contract delivered access road reorganization at the Scarborough Health Network Centenary Hospital site. Four Seasons completed the work in 2025 as prime contractor.
The SHN Centenary Hospital site required access road reorganization to support changes to site circulation. The contract delivered the road realignment within the active hospital campus environment, with construction proceeding alongside continuous emergency, patient, and staff traffic.
Maintaining hospital operations was the defining constraint of the work. Emergency vehicle access was maintained throughout the construction period. Site staging was coordinated continuously with hospital operations through the prime contractor framework.
Earthworks, granular placement, paving, and concrete work were delivered through Four Seasons in-house crews. The integrated trade capability supported the sequencing demands of construction within an active healthcare site.
The contract closed in 2025.
Key Aspects of the Work
Active Hospital Campus
Construction proceeded on an active hospital campus with continuous emergency, patient, visitor, and staff traffic. Site staging required ongoing coordination with hospital operations throughout the construction period.
Emergency Access Maintenance
Emergency vehicle access to the hospital was maintained throughout construction. Staging coordinated with hospital operations and emergency response to ensure no interruption to critical site access.
Road Realignment Scope
Road realignment supporting site access reorganization. Earthworks, granular placement, paving, and concrete work delivered through Four Seasons in-house crews.
Healthcare Client Coordination
Continuous coordination with Scarborough Health Network operations through the prime contractor framework. Staging plans, schedules, and work zone arrangements managed with sensitivity to hospital functions.
Work Components
| Road Realignment | Construction of realigned access roads to the Centenary Hospital site supporting reorganized site access. |
|---|---|
| Earthworks | Site grading and earthworks across the realignment footprint. |
| Granular and Paving | Granular base placement and asphalt paving supported by Four Seasons in-house paving crews and owned asphalt plants. |
| Concrete Work | Curb and gutter, sidewalks, and structural elements supporting the realigned roadway. |
| Drainage | Storm drainage infrastructure supporting the realigned roadway profile. |
| Site Coordination | Continuous coordination with Scarborough Health Network hospital operations. Emergency access maintained throughout construction. |
| Restoration | Site restoration and reinstatement of adjacent campus features on completion. |