Mayfield Road
Widening
Project Overview
Mayfield Road Widening was a major capacity expansion contract for the Region of Peel completed in 2021. Four Seasons delivered the work as prime contractor.
Mayfield Road is a principal regional east-west corridor in Peel Region experiencing significant growth in adjacent land use. The contract widened the corridor within the contract section, adding travel lanes and supporting infrastructure to the regional design standard.
The work was delivered as a single-prime contract integrating road widening, underground servicing, drainage, and full restoration within one continuous construction sequence. Four Seasons self-performed the principal trades through in-house crews.
Regional traffic on Mayfield Road continued throughout the construction period. Staging was coordinated with the Region of Peel through the standard contract administration framework. Book Seven certified traffic control personnel staffed every traffic-affecting work day on the contract.
The contract closed in 2021.
Key Aspects of the Work
Capacity Expansion
Roadway widening to add capacity on a regional east-west corridor experiencing significant growth in adjacent land use. Travel lane additions and supporting infrastructure delivered to the regional design standard.
Integrated Underground Work
Watermain, storm sewer, and sanitary sewer work integrated within the widening scope. Coordinated sequencing reduced overall contract duration and supported a single-prime delivery model.
Self-Performed Capability
Excavation, asphalt paving, concrete, and underground servicing delivered through Four Seasons in-house crews. Direct trade control supported schedule and quality outcomes.
Regional Traffic Maintenance
Continuous regional traffic maintained through staged construction. Book Seven certified traffic control on every traffic-affecting work day. Coordination with the Region of Peel through the standard contract administration framework.
Work Components
| Roadway Widening | Travel lane additions and supporting infrastructure within the contract section. Construction to the Region of Peel design standard. |
|---|---|
| Underground Servicing | Watermain, storm sewer, and sanitary sewer work integrated within the widening scope. |
| Earthworks | Subgrade preparation, granular base placement, and grading across the widened cross-section. |
| Paving | Asphalt binder and surface course placement supported by Four Seasons in-house paving crews and owned asphalt plants. |
| Concrete Work | Curb and gutter, sidewalks, and structural elements delivered through the dedicated concrete crew. |
| Drainage | Storm drainage infrastructure integrated within the new roadway profile. |
| Traffic Management | Staged construction maintained regional traffic and property access throughout the contract period. |