Oshawa GO
Station Building
Project Overview
The Oshawa GO Station Building was a major Metrolinx station construction contract delivered between 2015 and 2018. Four Seasons delivered the work as prime contractor.
Oshawa GO Station is a principal terminal on the Lakeshore East corridor. The contract delivered a new station building serving the existing station infrastructure, with construction proceeding alongside continuous GO Transit operations at the site.
The scope included foundation work, building structure, envelope, mechanical and electrical service integration, and the site civil works connecting the building to the existing station and parking infrastructure. Four Seasons delivered the principal civil trades through in-house crews and coordinated the building trades within the prime contractor framework.
Continuous GO Transit operations at Oshawa Station required passenger access, parking operations, and platform use to be maintained throughout the construction period. Staging was coordinated with Metrolinx station operations through the standard contract administration framework.
The contract closed in 2018.
Key Aspects of the Work
Station Building Construction
Complete station building construction including foundations, structure, building envelope, and integration with platform infrastructure. Building delivered to Metrolinx station design standards.
Active Station Environment
Construction proceeded with continuous GO Transit operations at the existing station. Passenger access, parking operations, and platform use maintained throughout the construction period.
Service Integration
Mechanical, electrical, communications, and fire protection service rough-in coordinated with the building structure. Multi-trade sequencing managed through the prime contractor framework.
Site Civil Works
Site civil works including grading, drainage, paving, and integration with the existing station and parking infrastructure delivered through Four Seasons in-house crews.
Work Components
| Foundations | Concrete foundation work including footings, foundation walls, and slab placement. Delivered through the Four Seasons concrete crew. |
|---|---|
| Building Structure | Structural elements coordinated with the building envelope and finishing trades. Quality Control supervision from a licensed Professional Engineer. |
| Service Rough-In | Mechanical, electrical, communications, and fire protection service rough-in coordinated within the building structure. |
| Building Envelope | Building envelope work integrated with the structural and mechanical sequencing. |
| Site Civil Works | Site grading, drainage, paving, and integration with adjacent station and parking infrastructure. |
| Coordination | Continuous coordination with Metrolinx station operations to maintain passenger access and platform use throughout construction. |
| Quality Standards | Construction to Metrolinx station design standards. Submittal management through the established Metrolinx framework. |