COR Certified Public Sector Since 2003
Hero Project Photography
Metrolinx

Oshawa GO
Station Building

Status
Completed 2018
Discipline
Transit and Rail Infrastructure
Location
Oshawa, Ontario
Role
Prime Contractor

Project Overview

The Oshawa GO Station Building was a major Metrolinx station construction contract delivered between 2015 and 2018. Four Seasons delivered the work as prime contractor.

Oshawa GO Station is a principal terminal on the Lakeshore East corridor. The contract delivered a new station building serving the existing station infrastructure, with construction proceeding alongside continuous GO Transit operations at the site.

The scope included foundation work, building structure, envelope, mechanical and electrical service integration, and the site civil works connecting the building to the existing station and parking infrastructure. Four Seasons delivered the principal civil trades through in-house crews and coordinated the building trades within the prime contractor framework.

Continuous GO Transit operations at Oshawa Station required passenger access, parking operations, and platform use to be maintained throughout the construction period. Staging was coordinated with Metrolinx station operations through the standard contract administration framework.

The contract closed in 2018.

Project Features

Key Aspects of the Work

01

Station Building Construction

Complete station building construction including foundations, structure, building envelope, and integration with platform infrastructure. Building delivered to Metrolinx station design standards.

02

Active Station Environment

Construction proceeded with continuous GO Transit operations at the existing station. Passenger access, parking operations, and platform use maintained throughout the construction period.

03

Service Integration

Mechanical, electrical, communications, and fire protection service rough-in coordinated with the building structure. Multi-trade sequencing managed through the prime contractor framework.

04

Site Civil Works

Site civil works including grading, drainage, paving, and integration with the existing station and parking infrastructure delivered through Four Seasons in-house crews.

Scope Detail

Work Components

Foundations Concrete foundation work including footings, foundation walls, and slab placement. Delivered through the Four Seasons concrete crew.
Building Structure Structural elements coordinated with the building envelope and finishing trades. Quality Control supervision from a licensed Professional Engineer.
Service Rough-In Mechanical, electrical, communications, and fire protection service rough-in coordinated within the building structure.
Building Envelope Building envelope work integrated with the structural and mechanical sequencing.
Site Civil Works Site grading, drainage, paving, and integration with adjacent station and parking infrastructure.
Coordination Continuous coordination with Metrolinx station operations to maintain passenger access and platform use throughout construction.
Quality Standards Construction to Metrolinx station design standards. Submittal management through the established Metrolinx framework.
Get in Touch

Discuss Your Next Project

Four Seasons works with public-sector clients across the Greater Toronto and Hamilton Area. Contact the head office in Brampton to discuss upcoming tenders or current contract administration.

Contact Us
Head Office
1-42 Wentworth Court
Brampton, Ontario L6T 5K6
Phone