Major Mackenzie
Drive Reconstruction
Project Overview
Major Mackenzie Drive Reconstruction delivered road reconstruction and trunk watermain installation for the Region of York completed in 2023. The project received the OPWA Structures Award in 2022 for the associated watermain work. Four Seasons delivered the contract as prime contractor.
Major Mackenzie Drive is a principal regional east-west arterial in York Region. The contract delivered full-depth reconstruction of the roadway within the contract section integrated with large diameter trunk watermain installation supporting the broader regional water distribution system.
The trunk watermain component received the OPWA Structures Award in 2022. Recognition reflected the technical demands of deep watermain installation in an active regional corridor environment and the integration of the underground scope within the road reconstruction sequence.
Continuous regional traffic on Major Mackenzie Drive was maintained throughout construction through coordinated staging with the Region of York. Book Seven certified traffic control personnel staffed every traffic-affecting work day on the contract.
The contract closed in 2023.
Key Aspects of the Work
Regional Arterial Reconstruction
Full-depth reconstruction of a principal regional east-west arterial in York Region. Continuous regional traffic and adjacent property access maintained throughout construction.
Trunk Watermain
Large diameter trunk watermain installation integrated within the road reconstruction scope. The watermain component received OPWA Structures Award recognition in 2022.
Self-Performed Trades
Road reconstruction, watermain installation, sewer work, concrete, and asphalt paving delivered through Four Seasons in-house crews. Direct trade control supported the integrated delivery.
Award Recognition
OPWA Structures Award, 2022, for the Major Mackenzie Watermain component of the contract. Recognition of the underground servicing capability.
Work Components
| Road Reconstruction | Full-depth pavement reconstruction within the contract section. Subgrade preparation, granular base placement, and asphalt binder and surface course paving. |
|---|---|
| Trunk Watermain | Large diameter trunk watermain installation integrated within the road reconstruction scope. Deep excavation, pipe installation, pressure testing, and connection to the live system. |
| Storm Sewer | Storm sewer work supporting the reconstructed roadway profile and adjacent drainage. |
| Concrete Work | Curb and gutter, sidewalks, and structural elements delivered through the Four Seasons concrete crew. |
| Asphalt Paving | Surface and binder course placement supported by in-house paving crews and owned asphalt plants. |
| Traffic Management | Staged construction with continuous regional traffic maintenance. Book Seven certified personnel on every traffic-affecting work day. |
| Restoration | Adjacent property restoration and corridor reinstatement on contract completion. |